Neither of us felt brilliant this morning, Hazel was sore and I had a terrible headache….But we pressed on and did 16 more locks, completing “Heartbreak Hill”, well done to the locking crew. Feeling a lot better we then did Harecastle Tunnel, taking 45 minutes to traverse and being wide enough for single way only traffic it’s quite a bit of engineering. From now on we can relax, only a few more locks before our lift back to Pyrford from Great Haywood Marina.